Turnkey Construction

One contract for everything from land to occupancy permit.

In a turnkey project you hand us your land or the building to be replaced, and we run every step including design, permits, construction and occupancy. You make the decisions and follow progress through our reports.

Scope

  • Soil survey and site plan
  • Architectural, structural, electrical and mechanical design
  • Permits and building inspection
  • Shell construction and structural frame
  • Finishing works, facade and landscaping
  • Occupancy permit and utility connections

How it works

  1. 1Survey and needs analysis
  2. 2Design and cost approval
  3. 3Permits and site set-up
  4. 4Construction and stage reports
  5. 5Occupancy, handover and warranty

Frequently asked questions

What is included in a turnkey price?

Design, permits, construction, finishing works and occupancy procedures defined in the contract are included. Extra requests are priced separately and never carried out without your written approval.

How long does an apartment project take?

A ground + 10 storey residential building usually takes 18–24 months after permits. The exact duration is set at the first survey according to project size.

Get a quote for this service

Tell us about your project in a few steps and we will reply within two business days.